NPDES
National Pollution Discharge Elimination System
Click here to complete our
Stormwater Awareness Survey
Here is where you can find all the information on the City of Thornton's NPDES permit and how it pertains to you.
The Stormwater Phase II Permit requires the City of Thornton to implement six minimum control measures over the next permitted period of 2008 - 2013. These minimum control measures are as follows:
- Public Education and Outreach
- Public Participation and Involvement
- Illicit Discharge Detection and Elimination
- Construction Site Runoff Control
- Post Construction Site Runoff Control
- Pollution Prevention/Good Housekeeping
Please click on a link below that best describes What information you are looking for, or the plus sign next to "NPDES" to the right.