Thornton Civic Center building

E-Gov: Online Services
Key City Links
Employment
Save Our Water

Thornton temperature
at time displayed...

Thornton, CO Forecast

NPDES

National Pollution Discharge Elimination System

NPDES Logo

Click here to complete our
Stormwater Awareness Survey


Here is where you can find all the information on the City of Thornton's NPDES permit and how it pertains to you.

The Stormwater Phase II Permit requires the City of Thornton to implement six minimum control measures over the next permitted period of 2008 - 2013. These minimum control measures are as follows:

  • Public Education and Outreach
  • Public Participation and Involvement
  • Illicit Discharge Detection and Elimination
  • Construction Site Runoff Control
  • Post Construction Site Runoff Control
  • Pollution Prevention/Good Housekeeping

Please click on a link below that best describes What information you are looking for, or the plus sign next to "NPDES" to the right.


Construction

Illegal Dumping

Construction Site Operator Education

H2O Joe and Flow for Kids

Volunteer


Runners at the start of Thornton road race
Not finding something? Click here to offer suggestions.
Department Links
+Streets
+Traffic
+Trash/Recycling
+Engineering
+Water
+Wastewater
+Education
+Stormwater Quality


City of Thornton
9500 Civic Center Drive, Thornton, CO 80229